220 Cedar Grove Place · last updated Nov 2, 2026
↻
Total violations10
Total completed ready for inspection1
Total remaining violations on HPD9
Vendors4 on file

Weekly update · Oct 26 – Nov 1, 2026

👀 Reviewed by Riverbend Property Management Nov 2, 2026
0 removed from HPD · 0 new from HPD · 6 past due, not started · 0 can't be repaired

Appointment Calendar

Appointments show here when an Appointment Date is picked on a violation. Tap one to open it.

November 2026

MonTueWedThuFri
26
27
28
29
30
2
3
4
5
6
9
16
17
18
19
20
23
24
25
26
27
30

December 2026

MonTueWedThuFri
30
1
2
3
4
7
8
9
10
11
14
15
16
17
18
21
22
23
24
25
28
29
30
31

Tenant Contact

One line per apartment with violations. Type the tenant's name, phone and email if you have it; it saves by itself.

Apartment #1B
Last updated Oct 31, 2026
Apartment #2E
Last updated Nov 1, 2026
Apartment #4B
Apartment #5C
Apartment #5F
Last updated Oct 30, 2026
Apartment #6D
Last updated Oct 29, 2026
Apartment #6F
Last updated Nov 2, 2026

Open Violations – Update Status

10 violations on HPD to update
1 · Choose an apartment, the common areas or the entire building.
2 · Then use the buttons: schedule a walk-through, work order, schedule repair, close out.

Pick from the drop-down to see violations.

CApt 6DCorrect by 12/24/2025
§ 27-2018 adm code abate the nuisance consisting of roaches in the entire apartment
Violation #16480818 · issued 12/23/2025 · certify by 12/29/2025
✓ Repair completed · 11/02/2026
Update repair status
Repair done by
🔒 Outside vendor
Repair started
🔒 Yes · 10/30/2026
Repair completed
🔒 Yes · 11/02/2026 · Contractor
Not able to perform repair
Appointment date
Notes last: Ready for HPD inspection
Last update Nov 2, 2026 · AllBoro Plumbing & Heating
History (1)
Nov 2, 2026 · AllBoro Plumbing & Heating · Repair completed 11/02/2026 by Contractor
ACommon area · floor 1Correct by 05/24/2026 · past due
§ 27-2047 adm code post a proper notice of the name and address of the managing agent in the public hall
Violation #16480860 · issued 02/23/2026 · certify by 05/29/2026
Not scheduled
Apt 2E2 violations · 1 class CSoonest correct by 05/26/2026 · past due
Not scheduled
☑ Violations for this visit 0 of 2 ticked
Tick the violations for this visit, then tap a button. The ones you don't tick stay in the list below.
Apt 2E · all violations (2)
CApt 2ECorrect by 05/26/2026 · past due
§ 27-2017.3 hmc remove the mold condition at ceiling in the bathroom
Violation #16480988 · issued 05/25/2026 · certify by 05/31/2026
Appointment · 11/12/2026
Do this one separately ›
Update repair status
Repair done by
Repair started
Repair completed
Not able to perform repair
Appointment date now 11/12/2026
Notes last: Appointment scheduled
Last update Nov 2, 2026 · Super (J. Ortiz)
History (1)
Nov 2, 2026 · Super (J. Ortiz) · Appointment 11/12/2026
BApt 2ECorrect by 10/10/2026 · past due
§ 27-2026 adm code repair the leaky waste line at bathroom sink
Violation #16480944 · issued 09/10/2026 · certify by 10/15/2026
Not scheduled
Do this one separately ›
Apt 5F2 violations · 1 class CSoonest correct by 07/09/2026 · past due
Not scheduled
☑ Violations for this visit 0 of 2 ticked
Tick the violations for this visit, then tap a button. The ones you don't tick stay in the list below.
Apt 5F · all violations (2)
CApt 5FCorrect by 07/09/2026 · past due
§ 27-2031 adm code provide hot water at all hot water fixtures
Violation #16480872 · issued 07/08/2026 · certify by 07/14/2026
Repair started · 11/02/2026
Do this one separately ›
Update repair status
Repair done by
🔒 Outside vendor
Repair started
🔒 Yes · 11/02/2026
Repair completed
Not able to perform repair
Appointment date
Notes
Last update Nov 2, 2026 · Super (J. Ortiz)
History (1)
Nov 2, 2026 · Super (J. Ortiz) · Repair started 11/02/2026
AApt 5FCorrect by 08/16/2026 · past due
§ 27-2005 adm code repair the broken or defective faucet at kitchen sink
Violation #16480801 · issued 05/18/2026 · certify by 08/21/2026
Not scheduled
Do this one separately ›
CApt 4BCorrect by 07/25/2026 · past due
§ 27-2029 adm code provide adequate supply of heat
Violation #16480746 · issued 07/24/2026 · certify by 07/30/2026
Appointment · 11/10/2026
Update repair status
Repair done by
Repair started
Repair completed
Not able to perform repair
Appointment date now 11/10/2026
Notes last: Appointment scheduled
Last update Nov 2, 2026 · AllBoro Plumbing & Heating
History (1)
Nov 2, 2026 · AllBoro Plumbing & Heating · Appointment 11/10/2026
BApt 5CCorrect by 07/29/2026 · past due
§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen
Violation #16481314 · issued 06/29/2026 · certify by 08/03/2026
Repair started · 11/02/2026
Update repair status
Repair done by
🔒 Outside vendor
Repair started
🔒 Yes · 11/02/2026
Repair completed
Not able to perform repair
Appointment date
Notes
Last update Nov 2, 2026 · AllBoro Plumbing & Heating
History (1)
Nov 2, 2026 · AllBoro Plumbing & Heating · Repair started 11/02/2026
AApt 1BCorrect by 10/15/2026 · past due
§ 27-2005 adm code repair the broken or defective faucet at kitchen sink
Violation #16481269 · issued 07/17/2026 · certify by 10/20/2026
Appointment · 11/13/2026
Update repair status
Repair done by
Repair started
Repair completed
Not able to perform repair
Appointment date now 11/13/2026
Notes last: Appointment scheduled
Last update Nov 2, 2026 · Property manager
History (1)
Nov 2, 2026 · Property manager · Appointment 11/13/2026
AApt 6FCorrect by 12/16/2026
§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and walls in the bathroom
Violation #16480727 · issued 09/17/2026 · certify by 12/21/2026
Appointment · 11/11/2026
Update repair status
Repair done by
Repair started
Repair completed
Not able to perform repair
Appointment date now 11/11/2026
Notes last: Appointment scheduled
Last update Nov 2, 2026 · Metro Electric LLC
History (1)
Nov 2, 2026 · Metro Electric LLC · Appointment 11/11/2026