| # | Apt / Area | Violation # | Class | Problem | Correct by | Date completed |
|---|---|---|---|---|---|---|
| 1 | Apt 1B › | 16481269 | A | REPAIR THE BROKEN OR DEFECTIVE FAUCET AT KITCHEN SINK | 10/21/2026 | |
| 2 | Apt 2E › | 16480944 | B | REPAIR THE LEAKY WASTE LINE AT BATHROOM SINK | 10/16/2026 | |
| 3 | Apt 2E › | 16480988 | C | REMOVE THE MOLD CONDITION AT CEILING IN THE BATHROOM | 06/02/2026 | |
| 4 | Apt 4B › | 16480746 | C | PROVIDE ADEQUATE SUPPLY OF HEAT | 07/31/2026 | |
| 5 | Apt 5C › | 16481314 | B | REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN | 08/02/2026 | |
| 6 | Apt 5F › | 16480872 | C | PROVIDE HOT WATER AT ALL HOT WATER FIXTURES | 07/15/2026 | |
| 7 | Apt 5F › | 16480801 | A | REPAIR THE BROKEN OR DEFECTIVE FAUCET AT KITCHEN SINK | 08/20/2026 | |
| 8 | Apt 6D › | 16480818 | C | ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT | 12/30/2025 | |
| 9 | Apt 6F › | 16480727 | A | PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WALLS IN THE BATHROOM | 12/22/2026 |