Appointments show here when an Appointment Date is picked on a violation. Tap one to open it.
One line per apartment with violations. Type the tenant's name, phone and email if you have it; it saves by itself.
| # | Apt # | Issued | Correct by | Violation # | Class | Issue | Description | Status | Schedule |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 1B | 08/10/2026 | 11/08/2026 | 16481269 | A | Plumbing & hot water | Repair: sink, faucet · kitchen | Not started | 📅 Schedule walk-through › |
| 2 | 2E | 10/02/2026 | 11/01/2026 | 16480944 | B | Plumbing & hot water | Repair: sink, leak, drain pipes · bathroom | Not started | 📅 Schedule walk-through › |
| 3 | 2E | 06/15/2026 | 06/16/2026 | 16480988 | C | Mold | Fix the moisture, remove the mold · bathroom | Not started | 📅 Schedule walk-through › |
| 4 | 4B | 08/17/2026 | 08/18/2026 | 16480746 | C | Heat | Install: heat | Not started | 📅 Schedule walk-through › |
| 5 | 5C | 07/20/2026 | 08/19/2026 | 16481314 | B | Plaster & paint | Repair plaster and paint: ceiling and walls · kitchen | Started | 📅 Schedule walk-through › |
| 6 | 5F | 06/08/2026 | 09/06/2026 | 16480801 | A | Plumbing & hot water | Repair: sink, faucet · kitchen | Not started | 📅 Schedule walk-through › |
| 7 | 5F | 07/30/2026 | 07/31/2026 | 16480872 | C | Plumbing & hot water | Install: hot water | Started | 📅 Schedule walk-through › |
| 8 | 6D | 01/14/2026 | 01/15/2026 | 16480818 | C | Pests & rodents | Exterminate: roaches · whole apartment | Repaired | 📅 Schedule walk-through › |
| 9 | 6F | 10/09/2026 | 01/07/2027 | 16480727 | A | Plaster & paint | Paint: ceiling and walls · bathroom | Not started | 📅 Schedule walk-through › |
| 10 | CA 1 | 03/17/2026 | 06/15/2026 | 16480860 | A | Signs & notices | Post a proper notice of the name and address of the managing agent… | Not started | 📅 Schedule walk-through › |
Pick from the drop-down to see violations.