Appointments show here when an Appointment Date is picked on a violation. Tap one to open it.
One line per apartment with violations. Type the tenant's name, phone and email if you have it; it saves by itself.
| Violation # | Apt | Class | Violation | Issued | Correct by | Status | |
|---|---|---|---|---|---|---|---|
| 16480727 | 6F | A | Paint with light colored paint to the satisfaction of this department the ceiling and walls in the bathroom | 09/28/2026 | 12/27/2026 | Not started | 📅 Schedule walk-through › |
| 16480944 | 2E | B | Repair the leaky waste line at bathroom sink | 09/21/2026 | 10/21/2026past due | Not started | 📅 Schedule walk-through › |
| 16480746 | 4B | C | Provide adequate supply of heat | 08/03/2026 | 08/04/2026past due | Not started | 📅 Schedule walk-through › |
| 16481269 | 1B | A | Repair the broken or defective faucet at kitchen sink | 07/27/2026 | 10/25/2026past due | Not started | 📅 Schedule walk-through › |
| 16480872 | 5F | C | Provide hot water at all hot water fixtures | 07/17/2026 | 07/18/2026past due | Started | 📅 Schedule walk-through › |
| 16481314 | 5C | B | Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen | 07/06/2026 | 08/05/2026past due | Started | 📅 Schedule walk-through › |
| 16480988 | 2E | C | Remove the mold condition at ceiling in the bathroom | 06/02/2026 | 06/03/2026past due | Not started | 📅 Schedule walk-through › |
| 16480801 | 5F | A | Repair the broken or defective faucet at kitchen sink | 05/25/2026 | 08/23/2026past due | Not started | 📅 Schedule walk-through › |
| 16480860 | Common | A | Post a proper notice of the name and address of the managing agent in the public hall | 03/04/2026 | 06/02/2026past due | Not started | 📅 Schedule walk-through › |
| 16480818 | 6D | C | Abate the nuisance consisting of roaches in the entire apartment | 01/01/2026 | 01/02/2026past due | Repaired | 📅 Schedule walk-through › |
Pick from the drop-down to see violations.